We where contacted for this Newmarket bathroom renovation, the clients had a leak in their shower and it was dripping down into the kitchen. This washroom had not been renovated since receiving it from the builder. We ended up gutting the washroom. removing the bath tub, toilet, shower and floors. We waterproofed everything with Schluter Waterproofing. The clients requested a linear drain, so we purchased one from Schluter also. The clients decided to go with a 24×24 inch tile throughout. After installing all the tiles we installed a freestanding bathtub. The clients where thrilled with the final product.